Concrete Volume Chart — Slabs, Bags & yd³ Yield

Concrete Volume Chart — Slabs, Bags & yd³ Yield featured image

Quick concrete volume reference: common slab sizes to cubic yards and 80 lb bag counts, plus bag-yield and waste multipliers from the concrete volume calculator. Covers patio slabs, garage floors, footings, and pier columns for field estimating — not a substitute for measuring the cavity you will actually fill.

How to Use This Chart

Find a slab close to your pour, read cubic yards, then add 5–10% waste before ordering. For odd shapes, stairs, continuous footings with steps, or thickened edges, use the concrete volume calculator instead of forcing a rectangle. Walkthrough of the formula and bags-vs-truck basics: concrete volume guide. If a pour already came up short or left a pile of leftover, switch to concrete volume troubleshooting — this chart will not diagnose a bad grade or a ft³/yd³ ticket mix-up.

Volume in cubic feet = length (ft) × width (ft) × thickness (ft). Convert to cubic yards by dividing by 27. Bag counts below assume 80 lb premix at 0.60 ft³ yield per bag with no waste — round up and add a waste multiplier before buying. Brand labels vary; always confirm the bag yield printed on the sack you will purchase.

These tables are sized for field estimating when you already know thickness and plan dimensions. They do not replace string-lining the subgrade. If the dirt is high in the middle and low at the edges, the “4″ slab” on the drawing is not a 4″ prism in the field — average measured thickness before you trust a row below.

Planning only Bag yields vary by brand and mix design — confirm the bag label. Ready-mix is usually better above ~1.5 yd³ once delivery minimums and placement speed are factored in. For the full ready-mix vs bagged fork (access, crew, on-site mixing), see Ready-Mix vs Bagged Concrete — Which to Use.

Reading yd³ vs Bags Without Mixing Them Up

Every row shows net volume first. Ready-mix plants sell cubic yards (often in 0.25 or 0.5 yd³ steps). Bag counts are a separate supply path — do not tell the dispatcher “eighty bags” when you mean 1.78 yd³. Convert, add waste, then speak in the unit the supplier uses.

One cubic yard is always 27 ft³. At 0.60 ft³ per 80 lb bag, pure math is 45 bags per yard. Field yield is often a little worse once you account for spillage, incomplete emptying of the mixer, and thirsty subgrade on the first pass. That is why the waste multiplier sits after the bag math, not instead of it.

Slab Volume — 3.5″ Thick

Common for sidewalks, shed pads, and light-duty paths. Confirm local thickness requirements — some jurisdictions want 4″ minimum even for walks. If the path slopes to a drain, volume is not a flat prism; either average depth across stations or use the calculator with a conservative thickness.

Slab (L × W) ft³ yd³ 80 lb bags*
4′ × 4′ 4.7 0.17 8
6′ × 6′ 10.5 0.39 18
8′ × 8′ 18.7 0.69 32
10′ × 10′ 29.2 1.08 49
12′ × 12′ 42.0 1.56 70
10′ × 20′ 58.3 2.16 98

*Bags = ceil(ft³ ÷ 0.60), no waste. At 1.56 yd³ net (12′ × 12′), a 10% waste bump is ~1.72 yd³ — usually a short-load ready-mix conversation if the truck can reach.

Slab Volume — 4″ Thick

Default residential patio and many garage approaches. A 10′ × 12′ × 4″ slab is 1.48 yd³ net — the classic example in the guide. With 10% waste you are near 1.63 yd³; that is almost always more pleasant as ready-mix than ~74–90 bags of hand mixing unless access forbids a truck.

Slab (L × W) ft³ yd³ 80 lb bags*
4′ × 4′ 5.3 0.20 9
6′ × 6′ 12.0 0.44 20
8′ × 8′ 21.3 0.79 36
10′ × 10′ 33.3 1.23 56
10′ × 12′ 40.0 1.48 67
12′ × 12′ 48.0 1.78 80
12′ × 16′ 64.0 2.37 107
16′ × 20′ 106.7 3.95 178
20′ × 24′ 160.0 5.93 267

Slab Volume — 5″ Thick

Often used for driveways and heavier residential garage slabs. Thickness jumps from 4″ to 5″ add 25% volume for the same footprint — easy to under-order if the drawing changed after the first estimate. Re-check the row when the inspector or engineer moves you up a thickness class.

Slab (L × W) ft³ yd³ 80 lb bags*
8′ × 8′ 26.7 0.99 45
10′ × 10′ 41.7 1.54 70
12′ × 12′ 60.0 2.22 100
12′ × 20′ 100.0 3.70 167
16′ × 24′ 160.0 5.93 267
20′ × 20′ 166.7 6.17 278

Slab Volume — 6″ Thick

Heavy-duty pads, some shop floors, and thickened residential slabs. At these volumes bag counts become crew-killers: a 12′ × 12′ × 6″ slab is 2.67 yd³ net (~120 bags before waste). Treat anything past ~2 yd³ as a delivery problem first, bag problem only if access forces it.

Slab (L × W) ft³ yd³ 80 lb bags*
4′ × 4′ 8.0 0.30 14
8′ × 8′ 32.0 1.19 54
10′ × 10′ 50.0 1.85 84
10′ × 12′ 60.0 2.22 100
12′ × 12′ 72.0 2.67 120
12′ × 16′ 96.0 3.56 160
16′ × 20′ 160.0 5.93 267
24′ × 24′ 288.0 10.67 480

Footings & Piers — Quick Rows

Footings are trench prisms: length × width × depth of the excavated cavity, not the slab footprint above. Over-excavation is the usual reason footing pours drink extra yards — measure the hole you dug. Round pier volume = π × r² × height; cardboard tubes often run slightly oversize versus the nominal diameter printed on the tube.

Shape Dimensions ft³ yd³ 80 lb bags*
Continuous footing 20 LF × 16″ W × 8″ D 17.8 0.66 30
Continuous footing 40 LF × 20″ W × 10″ D 55.6 2.06 93
Square pad 2′ × 2′ × 8″ 2.7 0.10 5
Square pad 3′ × 3′ × 12″ 9.0 0.33 15
Round pier 12″ Ø × 4′ deep 3.1 0.12 6
Round pier 18″ Ø × 5′ deep 8.8 0.33 15
Sonotube 10″ Ø × 3.5′ 1.9 0.07 4
Sonotube 12″ Ø × 4′ 3.1 0.12 6

When combining footings + slab in one ticket, calc each section separately, sum yd³, then apply waste once. Do not order from the slab rectangle alone and hope the trenches “fit.”

Bag Yield Reference

Bag Yield (typical) Bags / yd³ Notes
40 lb 0.30 ft³ ~90 Small patches and post holes
60 lb 0.45 ft³ ~60 Mid-weight option
80 lb 0.60 ft³ ~45 Most common premix size
90 lb 0.68 ft³ ~40 Check label — yield varies

One cubic yard = 27 ft³. At 0.60 ft³ per 80 lb bag, pure math gives 45 bags per yard — field yield is often slightly less due to spillage and uneven subgrade. If you are choosing bags vs a truck for the same yardage, read Ready-Mix vs Bagged after you know the number.

Waste Multipliers

Waste is not optional padding for bad math — it covers form bow, spill, pump/chute loss, rocky grade, and the first-pass absorption of dry subgrade. Skip it and you own the cold joint when the slab dies mid-pour.

Condition Add to net volume When to use
Flat slab, good forms 5% Simple rectangle, experienced crew
Typical residential pour 7–10% Default for most slab estimates
Steps, curves, or steep grade 10–15% Irregular geometry or hand placement
Continuous footings + piers 10% Form overlap and over-excavation

Example: 12′ × 12′ × 4″ slab = 1.78 yd³ net. At 10% waste → 1.78 × 1.10 = 1.96 yd³ order. In bags: 80 bags × 1.10 = 88 bags — buy 90. Round ready-mix up to the plant’s increment after waste — never truncate 1.96 down to 1.75 if the grade is already thirsty.

Ready-mix crossover Above ~1.5–2 yd³, compare bag cost and labor against a short-load delivery. Minimum truck charges often make bags expensive for large pours — unless access blocks the truck entirely.

Odd shapes, stairs, or piers

Concrete Volume Calculator →

Related

Any trade

Contractor Job Estimator

Contractor Job Estimator

Price remodels and GC work, then send a quote with no internal numbers.

Excel or Google Sheets. Best on a computer.

$29.00

Buy

See all products

Checkout opens in a new tab.