BuyCalculate cubic yards, bag counts, and order quantities for slabs, footings, columns, stairs, and piers.

One page. Speeds, chip load and drill feed, imperial and metric.
$3.99
Buy
27 pages. Milling, drilling, tapping, turning and CNC routing.
$12.99
Buy
Quote shop work and check operations against your spindle's top speed.
Excel or Google Sheets. Best on a computer.
$29.00
Buy
Card, 27-page guide and the estimator workbook. All six files.
Excel or Google Sheets. Best on a computer.
$34.99
$45.98 if bought separately — save $10.99
BuyCheckout opens in a new tab.
The base formula stays the same across shapes: volume in cubic feet, then divide by 27 to get cubic yards.
| Bag Size | Approx. Yield | Typical Use |
|---|---|---|
| 40 lb | 0.30 ft^3 | Small repairs |
| 60 lb | 0.45 ft^3 | Posts and pads |
| 80 lb | 0.60 ft^3 | Most DIY pours |
About 45 bags, because one 80 lb bag yields roughly 0.6 cubic feet and a cubic yard is 27 cubic feet.
Yes. Add 5% to 10% for waste, form irregularities, and spill loss. Complex pours may require more.
For most projects above 1 to 1.5 cubic yards, ready-mix is usually faster, cleaner, and often lower total effort.
This tool turns your pour dimensions into cubic yards, cubic feet, and bag counts so you can order ready-mix or buy bagged concrete without guessing. It handles slabs, continuous footings, columns, stair runs, and round piers or sonotubes from the same form. Optional price-per-yard input gives you a quick material budget before you call the plant or load the trailer.
Order ready-mix using the cubic yards figure and add 5–10% overage when grade, forms, or access are uncertain—running short mid-pour is expensive. Bag counts are useful for small pads, post holes, or touch-up; round up to full pallets when the supplier sells by the layer. Compare the order recommendation to your pump or chute plan before the truck arrives, and write the final yardage on the pour ticket so the crew and driver agree on quantity.
For footings and walls, verify trench width matches what you modeled—bell bottoms and keyways add volume fast. Stair pours often need a second person on forms; the calculator gives volume only, not finish labor. On cylinder piers, double-check diameter is outside form size if you are using sonotube labels versus measured ID.