
Contractor Job Estimator
$29.00
BuyA ridge that droops after a heavy pack, doors that suddenly scrape, cracks at corners — versus the slow, even creep a wood roof can show for decades
The roof snow load calculator sizes a balanced load. This page is the crime scene when that load, or a drift the calculator does not include, is already on the house. Framing that has to carry it: joist span calculator and deck beam span calculator.
What pg vs ps means: guide. Why you must not use ground snow as the roof number: comparison.
Know the mapped pg before you argue with a sag.A 28 psf roof on a 40 psf ground is not a math error — run the conversion.
Open Roof Snow Load Calculator →Ice-dam leaks at the eave (ceiling stains just inside the wall) are water, not necessarily overload. Different tool: ice & water shield coverage calculator.

$29.00
BuyCheckout opens here — you stay on this page.
The calculator returns a balanced roof snow load in psf. A roof rake is how you take snow off an existing deck from the ground. CSV rows 400–412 were nailers, vents, gutters, and ice barrier — not snow-removal tools — so these two SKUs are new.
21 ft extendable aluminum rake with wheels and oxford slide. Size the balanced roof snow load first; this is how you take snow off the deck from the ground — not a substitute for an engineer.
View on Amazon →
24 in blade with shingle-saver rollers so the edge never rides the asphalt. Relieving weight is not the same as designing for it — run the snow-load number before you argue with a sagging ridge.
View on Amazon →
Look up pg, then Ce, Ct, Is, and pitch. Flat-roof pf, slope factor Cs, governing psf. Planning estimate only.
Open Roof Snow Load Calculator →
IRC joist tables assume 40 psf live. A roof or covered deck in snow country is a different load path — size the snow first.
Open Joist Span Calculator →
Table R507.5(1) is 40/10. Tables R507.5(2)–(4) are snow rows this tool does not replace. Convert pg to roof snow, then talk to the table or an engineer.
Open Deck Beam Span Calculator →As an Amazon Associate, TestTalkHQ earns from qualifying purchases.
Wood roofs take a little permanent set. An even, long-standing sag that has looked the same for years, with no new cracks and no seasonal change in door fit, is often creep plus original camber — not this week’s snow. A ridge that dropped an inch after one storm is not creep. A porch beam that was cambered up and now sits flat under a 50 psf pack is a load check, not a paint problem.
Covered decks are where the 40 psf IRC cell and real snow part ways. If that deck is under a roof, run pg through the snow calculator, then look at whether Table R507.5(1) in the beam tool was even the right table (snow-country rows are R507.5(2)–(4)).
Maybe, after someone checks why it moved and what the actual load is. Sistering by eye is how you hide a truss problem. Run pg first, then hire the stamp.
No. Raking reduces weight and dam size. The eave still needs the R905.1.2 band where Table R301.2 requires it. Ice-barrier calculator.
Ground is not roof. Convert it. Then remember the joist table is a live-load cell, not a snow-load cell. Joist span calculator.